WordPress database error: [Table 'robt4384_avi.wpt1_ppress_meta_data' doesn't exist]
SELECT * FROM wpt1_ppress_meta_data WHERE meta_key = 'content_restrict_data'

Our engineering staff developed conceptual design improvements to Contra Costa Water District’s (CCWD) Treated Water System. This was part of CCWD’s 10-year, $8.3 million repair and rehabilitation program for their treated water facilities. Avila and Associates developed engineering improvements to 37-treated water facilities and conceptual multi-discipline (civil, mechanical, structural, aesthetics and geotechnical) design solutions for on-site equipment, piping, and structures.